A guide to 'proceeding at risk'

4 min read
Oct '25 • by Heather

Quick summary

Proceeding at risk can cut your project timeline by over a month and a half by starting building regulation drawings before planning approval, which usually takes 8-10 weeks. While it can save money and time, you may face extra fees of around £200-£300 plus VAT if changes are needed, and there's a risk of application rejection or conditions.

When it comes to your home, you probably want to keep risk out of the equation. However, in the planning and building regulations stage, a little risk can be your friend.

Proceeding at risk while you wait for the go-ahead from the council could shave months off your project’s timings, ideal for anyone raring to go or who has rental costs to consider. Interested? Here’s what you need to know…

What is proceeding at risk?

Proceeding at risk refers to starting your building regulation drawings before you have planning approval. It takes advantage of the 8-10 week waiting period homeowners must go through while a planning decision is made.

Why is time so important? Well, even with a great architect by your side (such as ourselves), you have so many third parties involved that, like planning, this is a time-consuming stage.

For example, Resi’s building regulations team are able to put together the necessary technical drawings within 2-3 weeks. However, because these drawings rely on the input from structural engineers and surveyors, waiting for this information will likely add 3 or more weeks to the timeline.

Therefore, by starting this process during the planning stage, homeowners are able to start construction as quickly as possible.